home

Page Two
Welcome to Page Two; where we post tidbits that aren't quite ready for the Front Page. Want more? Browse the Page Two archives.

Open House announced for SW Barbur High Crash Corridor Safety Project

Posted by Jonathan Maus (Publisher/Editor) on March 21st, 2011 at 12:56 pm

Here are the details:

SW Barbur Blvd. High Crash Corridor Safety Project

PUBLIC OPEN HOUSE

Wednesday, April 13, 2011
Drop by anytime between 6:30 & 8:00 PM
Optional Overview Presentation at 7:00 PM
Markham Elementary School (cafeteria) (10531 SW Capitol Highway)
Nearby TriMet Transit Access: Bus Line #44
Somali and Arabic interpreters available.

Stop by to learn more about transportation safety on SW Barbur Blvd. and share your feedback about:

  • Existing conditions
  • Pedestrian, bicycle & transit deficiencies
  • Problem areas

Email This Post Email This Post

Possibly related posts

- Daily bike news since 2005 -
BikePortland.org is a production of
PedalTown Media Inc.
321 SW 4th Ave, Ste. 401
Portland, OR 97204

Powered by WordPress. Theme by Clemens Orth.
Subscribe to RSS feed


Original images and content owned by Pedaltown Media, Inc. - Not to be used without permission.