home
 

Home | Forums | Close Calls | Photos | Stolen Bikes | Links | Jobs | About

Steel Bridge bike/ped path open during MAX construction

Posted by Jonathan Maus (Editor) on June 2nd, 2008 at 10:54 am

TriMet is installing new tracks on the Steel Bridge for the MAX Green Line. The construction started on June 1st and will last through August 30.

Bus, MAX, and auto traffic on the bridge will be affected but bike and pedestrian access will be maintained.

Here’s the official service alert from TriMet.

  • Digg
  • TwitThis
  • del.icio.us
  • Facebook
  • Google
  • Reddit
  • StumbleUpon

Email This Post Email This Post

Waterfront Bicycles

Possibly related posts

Leave a Reply

Comment moderation is enabled. Your comment may take some time to appear.

BikePortland.org is a production of PedalTown Media Inc.
833 SE Main St., Box #402
Portland, OR 97215
Contact
Powered by WordPress. Theme by Clemens Orth.
Subscribe to RSS feed

Opentracker: Web Site Analytics
Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivs 2.5 License.