North Portland Greenway story archives

Once completed, the North Portland Greenway path will connect Kelly Point Park at the tip of north Portland to the Eastbank Esplanade near the Steel Bridge via the Willamette River.

Bridge project that’s part of North Portland Greenway raises concerns over tree removal

Posted on February 21st, 2013 at 2:35 pm.

City design plans showing tree slated for removal.

A bridge project in St. Johns that’s part of the North Portland greenway and the 40-Mile Loop has gotten some unwanted attention this week. Portland Parks & Recreation is set to start construction on a new biking and walking bridge between Pier Park and Chimney Park; but removal of a large sequoia tree has sparked an outcry from at least one concerned citizen.

The story broke earlier this week on KATU-TV:

“The bridge would be part of the ten-mile North Portland greenway. Right now, Union Pacific Railroad tracks separate the two parks and the bridge would go over those tracks. But construction plans call for one giant sequoia inside Pier Park to fall in the process.

It is a tough pill to swallow for Dennis Keepes. He has sounded the alarm bells, trying to build enough support to save the tree.”

[Read more…]

N Williams, NoPo Greenway projects seek funding support

Posted on January 29th, 2013 at 11:45 am.

Existing conditions on Williams Ave-8-7

Will we finally see changes on Williams?
(Photo © J. Maus/BikePortland)

Two important Portland projects are vying for funding through a grant process being led by the Oregon Department of Transportation (ODOT) and the deadline to offer your feedback is this Thursday, January 31st.

Of the seven projects in the running from Portland and Washington County, I think two deserve a closer look.

PBOT has requested $1.47 million to fund their North Williams Traffic Safety and Operations Project. This is the infamous Williams project that had humble beginnings over two years ago, but then took many unexpected twists and turns. What started out as a straightforward bikeway project with a budget to do only pavement markings and signage has morphed turned into a full-blown capital project that will include new traffic signals, curb extensions, and even the creation of a neighborhood greenway on nearby NE Rodney.
[Read more…]

It’s not all bad: Northern sections of North Portland Greenway worth excitement

Posted on January 24th, 2013 at 1:35 pm.

The northern segments of the North Portland Greenway alignment being proposed by Portland Parks (green line) follows nearly the same route dreamed up by advocates (orange line).

[Read more…]

Trail group sees “major failings” with North Portland Greenway alignment

Posted on January 22nd, 2013 at 3:32 pm.

Interstate Ave -4

Advocates say putting the Greenway Trail
on surface streets (like N. Interstate shown here)
is unacceptable.
(Photo © J. Maus/BikePortland)

The City of Portland Parks & Recreation bureau continues to come under fire for their work on the North Portland Greenway Trail project. PP&R is in the process of designing the route of the paved path that will connect Kelley Point Park north of St. Johns to the Eastbank Esplanade in the central city. However, as we reported last month, many people are disappointed by the chosen alignment in the trail’s southern portion. Instead of staying along the Willamette River and creating a path away from auto traffic, PP&R has focused their efforts on what they consider a “near-term buildable” route on sections of busy, and sometimes narrow surface streets. The route, critics say, fails to live up to the vision and promise of the trail.
[Read more…]

Open house coming up for North Portland Greenway project

Posted on December 19th, 2012 at 10:38 am.

Portland Parks & Recreation is holding an open house for the North Portland Greenway Trail alignment project on January 9th. This event will be your chance to view the updated route maps. As we reported earlier this month, there are some big decisions on the table in terms of where Parks planners should focus their engineering and design efforts.

North Portland Greenway Open House
University of Portland, Chiles Center (5000 N. Willamette Blvd)
6:30 to 8:30 pm (presentation at 7:00pm)
Official project website

Parks’ proposal puts North Portland Greenway ‘Trail’ on surface streets – UPDATED

Posted on December 4th, 2012 at 5:09 pm.

Interstate Ave -6

Portland Parks & Rec says they’ll move forward
with using this portion of N Interstate for the
Willamette Greenway Trail.
(Photos © J. Maus/BikePortland)

The dream for the North Portland Greenway trail project has always been to extend the Eastbank Esplanade to St. Johns along the river. It was envisioned as a path that would be separated from motor vehicle traffic, just like Esplanade and Springwater exist today through the Central City.

Unfortunately, design and engineering of the project is moving forward with the assumption that the “trail” will actually be routed away from river and along busy, narrow, and dangerous roads.

When the Portland Parks & Recreation (PP&R) bureau came out with plans back in September showing the preferred alignment up on N Greeley and Interstate Ave, there was widespread criticism and concern.[Read more…]

More criticism leveled at proposed Greenway Trail route

Posted on September 21st, 2012 at 10:44 am.

“N. Greeley as an alternative to the Cement Road is unacceptable. The trail is to be a Willamette River Greenway Trail, not a tour of a truck route.”
— NPGreenway statement

The alignment for the North Portland Greenway Trail project being proposed by the Portland Parks & Recreation bureau is continuing to draw sharp criticism from activists and advocacy groups.

PP&R is hosting an online comment form to get feedback, and — as the comments to our story yesterday make clear — many people are not impressed that several segments of the proposed alignment use heavily trafficked streets and conventional bike lanes. The idea of a “trail” — or what I prefer to call a path — is that people can expect a dedicated, non-motorized facility away form the dangers and stresses of automobiles.
[Read more…]

Check the maps and comment on proposed North Portland Greenway Trail alignment

Posted on September 19th, 2012 at 5:37 pm.

Detail of proposed NP Greenway Trail alignment.

Portland Parks and Recreation has posted maps of the proposed alignment (PDF) of the North Portland Greenway Trail along with an online comment form to gauge public feedback about the routes. The City has been working with an advisory committee since January to come up with the precise alignment for the future 10-mile path that will connect the north end of the Eastbank Esplanade (near the Steel Bridge) to Kelley Point Park.

Reviews on the proposed alignment are coming back mixed. While there’s excitement to see progress on this project, I’ve gotten several emails of concern about the path’s southern segments. Below I’ll take you through the alignment maps and then share the concerns I’ve heard. (Please note: The orange dotted line is for a different trail project.)[Read more…]

City kicks off planning process for North Portland Greenway

Posted on January 19th, 2012 at 11:37 am.

Bike Fashion Show_ride and afterparty-71

A few pieces of the future
path already exist.
(Photo © J. Maus/BikePortland)

The City of Portland Parks & Recreation bureau has announced the beginning of the North Portland Greenway Trail Alignment Project — launching a 14 month process similar to the one they’re doing for the Sullivan’s Gulch Project.
When complete, the process will (hopefully) turn a 10-mile long, non-motorized path that will extend the northern end of the Eastbank Esplanade to the Columbia River, from dream to reality.

This is big news for a big project that has been many years in the making. Over six years ago I recall attending the very first public meeting of this project. It was hosted by citizen volunteers calling themselves, “Friends of the Greenway.” That group morphed into the full-fledged non-profit “npGreenway” which is still going strong today. npGreenway did a ton of heavy lifting to advocate for this project and bring it to where it is today.
[Read more…]

City begins public process to design North Portland Greenway corridor

Posted on October 18th, 2011 at 12:02 pm.

Bike Fashion Show_ride and afterparty-71

One of the few paved segments
of the corridor on
Swan Island.
(Photo © J. Maus)

The City of Portland is ready to start the public process on the North Portland Willamette Greenway Trail, a shared-use path that will someday extend the Eastbank Esplanade 10 miles — all the way to the St. Johns Bridge.

Citizen activists first came together to advocate for the project nearly six years ago. In May 2009, Metro ponied up $450,000 to help plan the route. Now, the City of Portland Parks & Recreation is looking for people to serve on the official Project Advisory Committee (PAC).[Read more…]