Steel Bridge lower deck closed May 5-7 and May 10

A reader just passed along a note that the bike and pedestrian walkway below the Steel Bridge will be closed this week. Here’s the official notice from PortlandOnline.com:

Lower deck of Steel Bridge to close for maintenance May 5-7 and May 10
HDR Engineering Inc. will be inspecting and maintaining the concrete portions of the Steel Bridge directly over the bicycle and pedestrian path on the lower walkway, which must be closed during the work. The walkway will be closed May 5 through May 7 for the maintenance and again on Sunday, May 10, because the entire lower deck will be in the raised position through the day for inspection of the lower surface of the upper structure. The sidewalk on the upper deck of the bridge will remain open to accommodate cyclists and walkers.

Jonathan Maus (Publisher/Editor)

Jonathan Maus (Publisher/Editor)

Founder of BikePortland (in 2005). Father of three. North Portlander. Basketball lover. Car owner and driver. If you have questions or feedback about this site or my work, feel free to contact me at @jonathan_maus on Twitter, via email at maus.jonathan@gmail.com, or phone/text at 503-706-8804. Also, if you read and appreciate this site, please become a supporter.

Subscribe
Notify of
guest

0 Comments
Inline Feedbacks
View all comments