Port project in Troutdale will include 2.1 mile path extension

Sandy River connections-13.jpg

Currently not signed or maintained for public use, this stretch of levee along the Columbia River north of Troutdale is slated for a paved path in 2018.
(Photos: J. Maus/BikePortland)

A Port of Portland project in Troutdale will include a significant extension to the 40-Mile Loop path along the Sandy and Columbia Rivers.

The extension totals 2.1 miles and will finally make it possible to walk and roll on a paved path between Marine Drive near Blue Lake Park (via NE 223rd Ave) and the new paths along the Sandy River constructed by the Oregon Department of Transportation in 2014.

Read more