Site icon BikePortland

First look at County’s new bike path to eastbound Sellwood Bridge


New section of Sellwood Bridge path-2.jpg
New section of path takes you from west side of Willamette River, up onto the bridge heading east into Sellwood.
(Photos: J. Maus/BikePortland)

Multnomah County opened a new connection from the west side of the river to the southern sidewalk on the new Sellwood Bridge about a month ago. I finally took a closer look at it on Friday.

The new bridge was closed when we last checked in on this project back in December. The gates have come down and you can now enjoy a wide and smooth ramp from the Willamette Greenway path that winds up to the sidewalk and bike lane on the bridge.

Here are a few more photos…

Looking east toward Sellwood from Highway 43:

New section of Sellwood Bridge path-1.jpg

Looking south up the ramp:

New section of Sellwood Bridge path-3.jpg

Advertisement

The path feels roomy at 14-feet wide:
New section of Sellwood Bridge path-4.jpg

Here are three views from the new bridge path looking back north:
New section of Sellwood Bridge path-5.jpg

New section of Sellwood Bridge path-6.jpg

New section of Sellwood Bridge path-7.jpg

Looking northeast east as the path becomes the southern sidewalk of the bridge:
New section of Sellwood Bridge path-8.jpg

Have you ridden this yet? What do you think?

— Jonathan Maus: (503) 706-8804, @jonathan_maus on Twitter and jonathan@bikeportland.org

BikePortland is supported by the community (that means you!). Please become a subscriber or make a donation today.

Switch to Desktop View with Comments