
Plan ahead.
(Photo: J.Maus/BikePortland)
(Photo: J.Maus/BikePortland)
Repairs to the pedestrian gate on the bridge between west Vancouver and north Portland will close its western (southbound) sidewalk from 9 a.m. to 5 p.m. Freeway lanes and the opposite sidewalk will be unaffected.
The Interstate 5 bridge’s sidewalks double as bike routes. Detours from one to the other are time-consuming because of the way the ramps are built.
“The sidewalk will be closed to make way for equipment needed for installation of a new traffic gate across the southbound lanes,” the Oregon Department of Transportation said in its news release. “The new gate replaces a gate damaged in a June crash on the bridge.”