View Single Post
  #1  
Old 01-09-2013, 02:12 PM
DaveT DaveT is offline
Member
Site Admin
 
Join Date: Sep 2006
Posts: 98
Thumbs up Rock Creek Trail / Evergreen Pkwy crossing improvements

Construction has been completed on the Everygreen Parkway crossing for the Rock Creek Trail. The crossing is now controlled by a new traffic signal on Evergreen Parkway, there is a cut-through in the median for path users, and both sides have three curb cuts - 1 for cyclists exiting the bike lane onto the path, 1 for cyclists entering the bike lane from the path, and 1 for peds/cyclists crossing Evergreen.

Been meaning to take a picture, but it is always dark when I ride through therre this time of year.

Google Maps link to the location: https://local.google.com/?ll=45.5450...03181&t=h&z=19

Dave
Reply With Quote