DaveT
01-09-2013, 01:12 PM
Construction has been completed on the Everygreen Parkway crossing for the Rock Creek Trail. The crossing is now controlled by a new traffic signal on Evergreen Parkway, there is a cut-through in the median for path users, and both sides have three curb cuts - 1 for cyclists exiting the bike lane onto the path, 1 for cyclists entering the bike lane from the path, and 1 for peds/cyclists crossing Evergreen.
Been meaning to take a picture, but it is always dark when I ride through therre this time of year.
Google Maps link to the location: https://local.google.com/?ll=45.545087,-122.885964&spn=0.001375,0.003181&t=h&z=19
Dave
Been meaning to take a picture, but it is always dark when I ride through therre this time of year.
Google Maps link to the location: https://local.google.com/?ll=45.545087,-122.885964&spn=0.001375,0.003181&t=h&z=19
Dave