Advisory: Southbound Interstate Bridge path closed for a week

This just in from ODOT:

Bike/ped path closed on SB Interstate Bridge
Gate protecting the public during bridge lifts inoperable because of electrical problems

The bike and pedestrian path on the southbound span of the Interstate Bridge will be closed until next week to repair electrical problems with the gate.
Bicyclists and pedestrians may use the path on the northbound span as a detour.
The gate, on southern end of the span, keeps bike and pedestrian traffic safe during bridge lifts.
ODOT hopes to open the path by the middle of next week.

Jonathan Maus (Publisher/Editor)

Jonathan Maus (Publisher/Editor)

Founder of BikePortland (in 2005). Father of three. North Portlander. Basketball lover. Car owner and driver. If you have questions or feedback about this site or my work, feel free to contact me at @jonathan_maus on Twitter, via email at maus.jonathan@gmail.com, or phone/text at 503-706-8804. Also, if you read and appreciate this site, please become a supporter.

Subscribe
Notify of
guest

3 Comments
oldest
newest most voted
Inline Feedbacks
View all comments
Spiffy
Spiffy
11 years ago

any idea how much bike and ped traffic that southbound path gets in a week?

Todd Boulanger
Todd Boulanger
11 years ago

The City (CoV) and CRC did some counts a 3+years back. Peak commute hour was in the 30s. With total over 100/ day.

Alan 1.0
Alan 1.0
11 years ago

Extra caution: the northbound sidewalk (east side of bridge) is the narrower one!

“Bicyclists and pedestrians may use the path on the northbound span as a detour.”

Sure, since both sidewalks are open to bikes and peds in either direction, anyway. (Biking the same direction as cars is good advice, I agree, when both sides are open.)

“The gate, on southern end of the span, keeps bike and pedestrian traffic safe during bridge lifts.”

I guess there must be a gate on the northern end of the span, too? Sure hope so! 🙂